Residents and other interested stakeholders are invited to attend Public Hearings to comment on the Environmental Assessment (EA) for the proposed Shared-Use Path Parking Facilities and Bicycle/Pedestrian Connections in the Villages of South Nyack and Tarrytown.
The New NY Bridge project has begun clearing the way for the construction of a state-of-the-art building that will be used for maintenance of the new three-mile crossing, which will carry billions of vehicles over the Hudson River during the next century.
This winter, volunteers from Tappan Zee Constructors, LLC (TZC) are lending their time and talent to Habitat for Humanity of Westchester’s latest endeavor: top-to-bottom renovations of homes for Iraq War veterans and their families.
After months of steady progress on the main span towers, Tappan Zee Constructors, LLC (TZC) has begun installing enormous concrete crossbeams between the iconic towers.
Will the bridge look exactly like the artist’s rendering that have been made public?
A:
Yes, overall the general design of the bridge will look similar to the artist rendering but it is subject to refinement as part of the design-build process. A Visual Quality Panel has been established to gather and consider public input and make recommendations on such characteristics as surface finishes, colors, lighting design, landscaping, and the shared-use bike and pedestrian path.